Aug. 29th, 2021

low_delta: (Default)
Nearing the end of stage 1.

In the morning I did a final sanding, and then painted. So the lower half is done, pending lower cabinet installation tomorrow, and flooring on Tuesday.

We took the plastic down, which impeded the progress of dust into the rest of the house, since we won't be making dust until maybe the weekend. I cleared out most of the tools. We just need to empty the fridge before the flooring people arrive to move it out of the kitchen on Tuesday. But it would be helpful to have it empty by the time the cabinets come tomorrow, since we'll need to move it out of their way. We also have to find a home for the kitchen table, and empty the bottom shelves of the pantry by tomorrow night.

And that's it! By the weekend I need to start on the upper half.

.

Profile

low_delta: (Default)
low_delta

June 2025

S M T W T F S
1234567
891011121314
151617 18192021
22232425262728
2930     

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jun. 22nd, 2025 03:47 am
Powered by Dreamwidth Studios
OSZAR »